NY Rental Lead RegistryPre-1980 rental with 2 or more units? Schedule rental lead inspections
Home / Asbestos

Asbestos Testing, Surveys & Air Monitoring in NY and Vermont

ClearVU is an independent asbestos consulting firm handling surveys and contamination assessments, project design and variance petitions, project monitoring, air sampling and clearances. We don't do abatement, so our findings stay independent of whoever does the removal.

Asbestos credentials on file

NYS DOL Asbestos Handling License (Restricted)
282890
exp. 01/31/2027
NYS DOL asbestos certifications
Inspector, management planner, project monitor, project designer, air sampling technician, supervisor. Held by ClearVU personnel.
VT Asbestos Consulting Company
Asb-Co-Con-000089
ClearVU Inspections LLC · exp. 3/1/2027

Bulk samples analyzed by independent, accredited labs.

In short

In New York, the building owner must have a NYS-certified asbestos inspector survey the affected areas before any renovation, remodeling, repair or demolition (Industrial Code Rule 56). NYS DOL requires an asbestos survey before work disturbs building materials, regardless of construction date. Before a demolition, the survey goes to the municipality issuing the permit and to the state Asbestos Control Bureau. In Vermont, the owner must hire a Vermont-licensed asbestos inspector before renovating, demolishing or cleaning up after a fire. We survey in both states: ClearVU Inspections in New York, ClearVU Inspections LLC in Vermont. We also handle project monitoring, clearance air sampling and variances.

If DOL has already posted a stop-work order on your project, see what happens next and how we can help.

SchoolsAHERA school asbestos inspections and three-year reinspectionsPerformed by NYS DOL-certified asbestos inspectors and management planners on our team
State housingExperience on NYS Homes and Community Renewal (HCR)-funded housing projectsAsbestos and lead surveys for those projects
LicensesNew York and Vermont licenses — NYS DOL Asbestos Handling License 282890 · VT Asb-Co-Con-000089
IndependentOur results stay independent of the contractor doing the work.Bulk samples analyzed by independent, accredited labs.
Certificates behind every asbestos reportAll licenses and expiration dates
NYS DOL · CertificationsInspector, management planner, project monitor, project designer, air sampling technician, supervisorHeld by ClearVU personnel
Vermont · CertificationsInspector/management planner, project designer, project monitor, PCM analyst, field analystHeld by ClearVU personnel
NYS DOL · Asbestos Handling License282890RestrictedExp. 01/31/2027
Vermont · CompanyAsb-Co-Con-000089Consulting CompanyClearVU Inspections LLCExp. 3/1/2027
Scope of service

Asbestos services

Pick the job you are planning. Each page explains what the rules require and what you get from us.

01 · Surveys

Pre-renovation and pre-demolition surveys

Know what is in the building before you renovate or demolish, with a report the building department can accept.

Asbestos surveys
02 · Clearance

Third-party clearance air sampling

Independent clearance air sampling after the contractor finishes.

Clearance air sampling
03 · Monitoring

Project monitoring

Independent on-site monitoring and documentation that holds up to review.

Project monitoring
Variance and design deliverables
  • DesignProject design by a DOL-certified Project Designer
  • PetitionSite-specific variance petition, filed through MPWR
  • TermA site-specific variance is valid for one year
04 · Variances

NY DOL variances and project design

When a job cannot follow Code Rule 56 as written, we design the project and prepare the variance petition.

Variances and project design
VermiculiteTest it.
Treat it
as ACM.
Vermiculite

Vermiculite attic insulation testing and clearance

Vermiculite attic insulation is treated as asbestos-containing. New York does not recognize a bulk test that can prove it asbestos-free, and Vermont tells owners to treat it as asbestos. We sample it under our asbestos licenses and perform clearance testing after a licensed contractor removes it.

Need lead paint, PCBs, mercury, and refrigerants inventoried on the same pre-demolition job? See hazmat and PCB surveys.

Request vermiculite testing →
Schools · AHERA

AHERA school inspections and reinspections

The Asbestos Hazard Emergency Response Act (AHERA, 40 CFR Part 763, Subpart E) applies to public and non-profit private elementary and secondary school buildings. It calls for asbestos inspections, management plans, and reinspections every three years.

ClearVU performs AHERA inspections, three-year reinspections, and management-plan updates for schools in New York and Vermont. Those inspections are performed by NYS DOL-certified asbestos inspectors and management planners on our team.

New York license: NYS DOL Asbestos Handling License 282890.

Request an AHERA inspection →

Credentials for AHERA work

NYS DOL asbestos certifications
Inspector, management planner. Held by ClearVU personnel.
Vermont asbestos certifications
Inspector/management planner. Held by ClearVU personnel.
NYS DOL Asbestos Handling License (Restricted)
282890
exp. 01/31/2027
By state

Rules differ by state

New York asbestos rules and Vermont asbestos rules.

New York and Vermont

New York and Vermont requirements

The same firm surveys in both states. ClearVU Inspections LLC is the holder on the Vermont consulting-company license. New York license: NYS DOL Asbestos Handling License 282890.

New YorkVermont
Who must inspectA NYS-certified asbestos inspector, before renovation, repair, or demolition (DOL P231).A Vermont-licensed asbestos inspector before renovation, demolition, or fire cleanup.
NoticeBefore demolition, the survey goes to the municipality and the Asbestos Control Bureau.Demolition needs 10 working days' notice to the Vermont Department of Health.
Some homesNYS DOL requires an asbestos survey before work disturbs building materials, regardless of construction date.Some owner-occupied homes are exempt. Call and we will tell you what applies.
Fire debrisMixed fire debris has no approved bulk method. A contamination assessment is sometimes needed, and a Project Designer determines whether a site-specific variance is needed.A licensed inspector is required before fire cleanup.
Licenses282890. Inspector, management planner, project monitor, project designer, air sampling technician, supervisor.Asb-Co-Con-000089. Inspector, management planner, project designer, project monitor, PCM analyst, field analyst.

Sources: NYS DOL P232, P231, Vermont DOH fact sheet.

Abatement, demolition, remediation

Planning an abatement or demolition project?

Before the work starts and before anyone signs off at the end, you need independent testing. ClearVU handles pre-demolition asbestos surveys, project monitoring, clearance air sampling, and NY DOL variances.

Why independent testing. ClearVU Environmental tests and documents. Our findings stay independent of whoever does the cleanup work.

Before

Do I need a survey before removal or demolition?

Yes. In both New York and Vermont, a survey is required before renovation, rehab, or demolition, no matter the building's age.

Surveys

Can I remove asbestos myself?

In New York, the single-family, owner-occupied exemption (12 NYCRR 56-1.3(a), DOL P229) applies only to a single-family dwelling occupied or to be occupied by the owner, with the owner doing the work personally. Not landlords, flippers, or contractors, and not buildings slated for demolition.

When do I need a variance?

When a job cannot follow Code Rule 56 as written, a DOL-certified Project Designer prepares a site-specific variance petition, filed through MPWR and valid one year.

Variances
During

Can the abatement contractor do its own air testing?

No. ICR 56-4.3 requires project air sampling by a third-party firm hired by the owner and independent of the abatement contractor.

Clearance air sampling

Who monitors the job?

A DOL-certified project monitor documents the work. Monitoring and air sampling can be on the same job (ICR 56-4.4).

Project monitoring
After

Who tests the air after abatement?

An independent third-party air sampling firm (ICR 56-4.3). Clearance criteria are set in Industrial Code Rule 56.

Clearance air sampling

Do I need an asbestos survey before tearing out mold-damaged materials?

NYS DOL requires an asbestos survey before work disturbs building materials, regardless of construction date.

Surveys
What the report includes

A report the building department can use

Survey reports identify homogeneous materials, quantities, sample locations, laboratory results for bulk samples, and the licenses of the inspector. Bulk samples analyzed by independent, accredited labs.

Combined asbestos and lead surveys for pre-1978 renovations are available in New York and Vermont. See lead inspections.

Who we work with

Contractors who need a permit survey, owners planning demolition, realtors and buyers, property managers, and schools and housing providers. Experience includes AHERA school inspections and NYS HCR-funded housing projects.

Request a proposal →

Do I need an asbestos survey before renovating in New York?

Generally yes. NYS DOL guidance (P231) says Industrial Code Rule 56 requires a survey by a NYS-certified inspector before interior or exterior renovation, remodeling, repair, and demolition.

Source: NYS DOL P231

Do I need an asbestos survey if my building is newer?

NYS DOL requires an asbestos survey before work disturbs building materials, regardless of construction date. EPA and Vermont rules have no age cutoff either, though some homes are exempt; call us and we'll tell you what applies.

Source: NYS DOL (P232)

Can I remove asbestos myself?

In New York, the single-family, owner-occupied exemption (12 NYCRR 56-1.3(a), DOL P229) applies only to a single-family dwelling occupied or to be occupied by the owner, with the owner doing the work personally. That path is not for landlords, flippers, or contractors, and it is not for buildings slated for demolition.

Source: NYS DOL P229

What happens if asbestos is found?

A licensed abatement contractor removes it before other trades touch it (ICR 56-5.1). The survey stays on site. Independent air sampling follows under ICR 56-4.3.

Source: Industrial Code Rule 56

Who can do clearance air sampling?

A third-party firm hired by the owner and independent of the abatement contractor (ICR 56-4.3). The survey or monitor firm may do it when it only tests on that job (56-4.4). We don't do abatement, so we can serve as the independent air-sampling firm on jobs where we're hired by the owner or the owner's agent (ICR 56-4.3, 56-4.4(a)).

Source: ICR 56-4.3

Do I need an inspection in Vermont?

In most cases, yes. Vermont requires a VT-licensed asbestos inspector before renovation or demolition. Some owner-occupied homes are exempt; call us and we'll tell you what applies.

Source: Vermont Department of Health

Is vermiculite insulation asbestos?

Treat it as asbestos. New York says there is no reliable bulk test that can prove vermiculite asbestos-free, and Vermont says to treat it as asbestos-containing. We test and do clearance after a licensed contractor removes it.

Source: NYS DOL asbestos information

How long do results take?

We'll tell you when to expect the report when you book.

When is a site-specific variance needed?

When a project cannot follow Industrial Code Rule 56 as written. A DOL-certified Project Designer prepares the petition, it is filed through MPWR, and a site-specific variance is valid for one year.

Variances and project design

What affects the cost of an asbestos survey?

The number of areas and materials to sample, building size and access, how many samples go to the lab, rush lab turnaround, and the report the job needs, such as a demolition submittal. Call for a written quote.

Service areas

Where we survey

Queensbury and Glens Falls, the Lake George towns, Saratoga County, Washington County, the Capital Region, the Adirondacks, and all of Vermont. Lead inspections, mold assessments, water testing, and environmental testing are offered in New York and Vermont. See the service-area pages.

Planning a renovation or demolition? Schedule the asbestos survey.

Call 518.832.9213 or email support [at] cvenv [dot] com. Sample drop-off at our Queensbury office.